After water had chronically infiltrated the Consolidated Supply building’s exterior envelope and created substantial structural damage, Erickson Structural personnel were retained to evaluate and repair the resulting structural damage.  To maintain ongoing business operations within the building, the building’s exterior skin was removed and evaluated a section at a time, and damaged structural framing was repaired utilizing techniques developed in consultation with the general contractor.  An addition to the building was also designed and constructed during this project. Erickson Structural personnel worked closely with the repair contractor to coordinate construction in phases, thus avoiding having the entire building exterior open at once, and ensuring ongoing business operations.